RECORD NO

DOCUMENT TITLE

FILENAME

CONTENT

#PAGES

10361

Draft – Operable Unit 3 Remedial Investigation Addendum Monitoring Well 25 Construction Report

 

March 2005

 

NAS710361A.PDF

Table of Contents

1.0   Introduction

2.0   Summary of Multi-Port Groundwater Monitoring Well MW-25 Installation

3.0   Sample Analytical Results

4.0   Summary

5.0   Selected References

List of Figures

List of Tables

List of Appendices

Acronyms and Abbreviations

27

NAS710361B.PDF

Appendix A – City of Pasadena Well Permit Package

42

 

Appendix B – MW-25 Boring/Well Construction Log and MP Casing Construction Details

 

Appendix C – IDW and Sample Analysis Documentation


Appendix D – Downhole Geophysical Log

 

NAS710361C.PDF

Appendix E – Purge Logs

 

Appendix F – MW-25 Video Log

 

Appendix G – Barcad Pump Operational Diagram

 

Appendix H – Surveyor’s Report

 

24

 

Close This Window