Pasadena Water and Power’s Synopsis of Technical
Memorandum on the Perchlorate Contamination of the
Sunset Reservoir Wells, May 2012
PWP Letter to the EPA re: Perchlorate
Contamination of the Sunset Reservoir Wells and Technical Memorandum on the
Monk Hill Treatment System after One Year of Operation, August 17, 2012
Pasadena Water and Power Technical Memorandum on Stable
Isotope Analysis of Industrial Sources of Perchlorate,
Raymond Basin Well Samples and Biodegration, August
2012
|