RECORD NO

DOCUMENT TITLE

FILENAME

CONTENT

#PAGES

10374

Final Operable

Unit 3 Remedial Investigation Addendum Monitoring Well 25 Construction Report

 

July 2005

 

NAS710374A.PDF

Figures

Tables

Appendices

Acronyms and Abbreviations

1.0   Introduction

2.0   Summary of Multi-Port Groundwater Monitoring Well MW-25

3.0   Sample Analytical Results

4.0   Summary

5.0   Selected References

27

NAS710374B.PDF

Appendix A – City of Pasadena Well Permit Package

6

NAS710374C.PDF

 

 

NAS710374D.PDF

 

 

NAS710374E.PDF

 

NAS710374F.PDF

 

NAS710374G.PDF

 

NAS710374H.PDF

 

 

NAS710374I.PDF

 

  

Appendix B – MW-25 Boring/Well Construction Log and MP Casing Construction Details

 

Appendix C – IDW and Sample Analysis Documentation

 

Appendix D – Downhole Geophysical Log

 

 

Appendix E – Purge Logs

 

Appendix F – MW-25 Video Log

 

 

Appendix G – Bacard Pump Operational Diagram

 

Appendix H – Surveyor’s Report

18

 

 

 

3

 

 

18

 

 

19

 

1

 

 

2

 

 

2

 

 

Close This Window