RECORD NO |
DOCUMENT TITLE |
FILENAME |
CONTENT |
#PAGES | ||
---|---|---|---|---|---|---|
10629 |
Technical Memorandum Third Quarter 2017 Groundwater Monitoring Summary
|
Main Text |
51 |
|||
NAS710629B.PDF | Attachment 1 – Quality Assurance/Quality Control Summary | 5 | ||||
Attachment 2 – Data Validation Reports (Summary Sheets) |
500 |
|||||
NAS710629D.PDF | Attachment 3 – Laboratory Analytical Reports | 745 | ||||
NAS710629E.PDF | Attachment 4 – Field Logs | 24 | ||||
NAS710629F.PDF | Attachment 5 – Water Level Measurements | 33 | ||||
NAS710629G.PDF | Attachment 6 – Time-series Plots | 81 | ||||
NAS710629H.PDF | Attachment 7 – Tables 1A, 2A, and 3A (Historical Perchlorate, VOCs and Metals from 1996 to present) | 429 |
||||
|
Attachment 8 - Summary of Construction Details for All JPL Groundwater Monitoring Wells |
4
|
||||