RECORD NO |
DOCUMENT TITLE |
FILENAME |
CONTENT |
#PAGES | |||
---|---|---|---|---|---|---|---|
10670 |
Technical Memorandum Second Quarter 2021 Groundwater Monitoring Summary
|
Main Text |
56 |
||||
NAS710670_Attachment_1_QA_QC.pdf | Attachment 1 – Quality Assurance/Quality Control Summary | 5 | |||||
Attachment 2 – Data Validation Reports |
425 |
||||||
NAS710670_Attachment_3_Lab_Reports.pdf | Attachment 3 – Laboratory Analytical Reports | 854 | |||||
NAS710670_Attachment_4_Field_Logs.pdf | Attachment 4 – Field Logs | 26 | |||||
NAS710670_Attachment_5_Water_Level_Measurements.pdf | Attachment 5 – Water Level Measurements | 33 | |||||
NAS710670_Attachment_6_Time_Series_Plots.pdf | Attachment 6 – Time-series Plots | 101 | |||||
NAS710670_Attachment_7_Historic_Current_Data_Tables.pdf | Attachment 7 – Tables 1A, 2A, and 3A (Historical Perchlorate, VOCs and Metals from 1996 to present) | 529 | |||||
NAS710670_Attachment_8_Well_Construction_Details.pdf
|
Attachment 8 - Summary of Construction Details for All JPL Groundwater Monitoring Wells |
4
|
|||||