RECORD NO |
DOCUMENT TITLE |
FILENAME |
CONTENT |
#PAGES |
||
---|---|---|---|---|---|---|
10546 |
Technical Memorandum: First Quarter 2012 Groundwater Monitoring Summary
April 1, 2012 |
Introduction On-Facility Source Area Wells Other On-Facility Wells Perimeter Off-Facility
Wells All-Well Categories (Other Results) Attachments |
40 |
|||
Attachment 1 – Quality Assurance/Quality Control Summary Attachment 2 – Date Validation Reports (Summary Sheets)
|
|
|||||
|
Attachment 3 – Laboratory Analytical Results (Summary Sheets), Part 1-3
Attachment 4 – Field Logs Attachment 5 – Water Level Measurements Attachment 6 – Time-Series Concentration Plots
Attachment 7 – Historical Perchlorate, VOCs, and Metals from 1996-present |
|
||||
|
|
|
|
|
|
|