RECORD NO

DOCUMENT TITLE

FILENAME

CONTENT

#PAGES

10575

Technical Memorandum

Second Quarter 2013 Groundwater Monitoring Summary

July 2013

 

NAS710575A.PDF

Introduction

On-Facility Source Area Wells

Perchlorate Analytical Results

VOC Analytical Results

Other Notable Analytic Results

Other Results

List of Attachments

 

 

47

NAS710575B.PDF

 

Attachment 1 – Quality Assurance/Quality Control Summary

Attachment 2 – Data Validation Reports (Summary Sheets)

469

NAS710575C.PDF

 

 

NAS710575D.PDF

 

NAS710575E.PDF

 

 

 

NAS710575F.PDF

 

  

Attachment 3 – Part 1: Laboratory Analytical Results (Summary Sheets)

 

Attachment 3 – Part 2: Laboratory Analytical Results (Summary Sheets)

 

Attachment 4 – Field Logs

Attachment 5 – Water Level Measurements

Attachment 6 – Time-series Concentration Plots

Attachment 7 – Tables 1A, 2A, and 3A (Historical Perchlorate, VOCs and Metals from 1996 to present)

941

 

 

277

 

73

 

 

 

332

 

Close This Window