RECORD NO

DOCUMENT TITLE

FILENAME

CONTENT

#PAGES

10368

Final Operational Unit 3 Remedial Investigation Monitoring Well

26 Construction Report

 

August 2005

 

NAS7103568A.PDF

1.0   Introduction

2.0   Summary of Multi-Port Groundwater Monitoring Well MW-26 Installation

3.0   Sample Analytical Results

4.0   Summary

5.0   Selected References

Tables

Figures

Appendices

Acronyms and Abbreviations

 

25

NAS710368B.PDF

Appendix A – City of Pasadena Well Permit Package

8

NAS710368C.PDF

 

 

NAS710368D.PDF

 

NAS710368E.PDF

 

 

NAS710368F.PDF

 

NAS710368G.PDF

 

NAS710368H.PDF

 

Appendix B – MW-26 Boring/Well Construction Log and MP Casing Construction Details

 

Appendix C – IDW and Sample Analysis Documentation

 

Appendix D – Downhole Geophysical Log

 

 

Appendix E – Pure Logs

 

Appendix F – MW 26 Video Log

 

Surveyor’s Report

 

8

 

 

 

46

 

 

15

 

 

15

 

1

 

2

 

Close This Window