RECORD NO |
DOCUMENT TITLE |
FILENAME |
CONTENT |
#PAGES | |||
---|---|---|---|---|---|---|---|
10639 |
Technical Memorandum Second Quarter 2018 Groundwater Monitoring Summary
|
Main Text |
50 |
||||
NAS710639_Attachment_1_QA_QC.pdf | Attachment 1 – Quality Assurance/Quality Control Summary | 5 | |||||
Attachment 2 – Data Validation Reports |
903 |
||||||
NAS710639_Attachment_3_Lab_Reports.PDF | Attachment 3 – Laboratory Analytical Reports | 877 | |||||
NAS710639_Attachment_4_Field_Logs.PDF | Attachment 4 – Field Logs | 26 | |||||
NAS710639_Attachment_5_Water_Level_Measurements.PDF | Attachment 5 – Water Level Measurements | 33 | |||||
NAS710639_Attachment_6_Time_Series_Plots.PDF | Attachment 6 – Time-series Plots | 81 | |||||
NAS710639_Attachment_7_Historic_Current_Data_Tables.PDF | Attachment 7 – Tables 1A, 2A, and 3A (Historical Perchlorate, VOCs and Metals from 1996 to present) | 455 |
|||||
NAS710639_Attachment_8_Well_Construction_Details.PDF
|
Attachment 8 - Summary of Construction Details for All JPL Groundwater Monitoring Wells |
4
|
|||||