RECORD NO |
DOCUMENT TITLE |
FILENAME |
CONTENT |
#PAGES | |||
---|---|---|---|---|---|---|---|
10653 |
Technical Memorandum Third Quarter
|
Main Text |
19 |
||||
NAS710653_Attachment_1_QA_QC.pdf | Attachment 1 – Quality Assurance/Quality Control Summary | 5 | |||||
Attachment 2 – Data Validation Reports |
695 |
||||||
NAS710653_Attachment_3_Lab_Reports.pdf | Attachment 3 – Laboratory Analytical Reports | 753 | |||||
NAS710653_Attachment_4_Field_Logs.pdf | Attachment 4 – Field Logs | 24 | |||||
NAS710653_Attachment_5_Water_Level_Measurements.pdf | Attachment 5 – Water Level Measurements | 33 | |||||
NAS710653_Attachment_6_Time_Series_Plots.pdf | Attachment 6 – Time-series Plots | 101 | |||||
NAS710653_Attachment_7_Historic_Current_Data_Tables.pdf | Attachment 7 – Tables 1A, 2A, and 3A (Historical Perchlorate, VOCs and Metals from 1996 to present) | 485 |
|||||
NAS710653_Attachment_8_Well_Construction_Details.pdf
|
Attachment 8 - Summary of Construction Details for All JPL Groundwater Monitoring Wells |
4
|
|||||