RECORD NO |
DOCUMENT TITLE |
FILENAME |
CONTENT |
#PAGES |
||
---|---|---|---|---|---|---|
10683 |
Technical Memorandum First Quarter 2022 Groundwater Monitoring Summary
|
NAS710683.pdf | Introduction |
52 | ||
Attachment 1 |
Attachment 1 – Quality Assurance/Quality Control Summary | 5 | ||||
Attachment 2 | Attachment 2 – Data Validation Reports (Summary Sheets) | 601 | ||||
Attachment 3 | Attachment 3 – Laboratory Analytical Reports | 807 | ||||
Attachment 4 | Attachment 4 – Field Logs | 24 | ||||
Attachment 5 | Attachment 5 – Water Level Measurements | 33 | ||||
Attachment 6 | Attachment 6 – Time-series Concentration Plots | 101 | ||||
Attachment 7 | Attachment 7 – Tables 1A, 2A, and 3A (Historical Perchlorate, VOCs and Metals from 1996 to present) | 541 | ||||
Attachment 8
|
Attachment
8 – Summary of Construction Details for All JPL Groundwater Monitoring Wells
|
4
|
||||